Chat to our customer service

Enquire Now

Complete your details below and we will be in touch as soon as possible.

*
*
*
*

Brand Info

View MKS website

Product Downloads

Metal Etch Trap, ISO-KF NW 40 Inline

Part Number: 63-0406211Product Details

Overview

The MKS Instruments, HPS® Metal Etch Trap, when installed as a component in an Effluent Management Subsystem™, efficiently traps condensable effluents that are generated by aluminum etch processes without reducing pumping speed. High trapping capacity means a longer time between maintenance. Maintenance is simplified: you replace a single disposable trapping element rather than having to clean up many feet of vacuum line. Low cost of ownership is created by not having to run heated lines all the way to the scrubber.
Features

• Increases throughput and uptime
• Decreases maintenance frequency and reduces maintenance time
• Eliminates the use of heaters after the trap
• Protects vacuum pump and valves
• Rapid return on investment
• Low cost of ownership
• High flow conductance
• Compact, light weight design
• Available in sizes for most metal etch lines

Benefits

An efficient metal etch Effluent Management Subsystem™ consists of the Metal Etch Trap, HPS® Series 46 heaters, an HPS® heated valve, and an HPS® Virtual Wall™.

The Metal Etch Trap operates most efficiently when it is installed in the foreline between the turbo pump and the dry pump with a line pressure above 100 mTorr. The Metal Etch Trap operates in conjunction with a heated foreline operating at 105°C which prevents condensation of the exhaust byproducts. The heating of this line must be very uniform, with no cold spots.

The Metal Etch Trap is installed immediately downstream of the heated line no more than 5 to 6 feet from the process chamber. The ability to trap AlCl3 close to the process chamber rather than having to run heated lines 20-30 feet saves a significant amount of money on installation and ongoing maintenance.

Installing a VirtualWall™ at the entrance to the scrubber prevents the reaction between BCl3 and water vapor that forms solid byproducts. The Virtual Wall™ provides a heated nitrogen barrier preventing water vapor from rising out of the wet scrubber into the exhaust line. This prevents the surface reactions that form the solid deposits that clog the entrance to the
scrubber.

Applications

Aluminum etch systems use chlorine and boron trichloride gases to etch aluminum on wafer surfaces. The byproducts of the aluminum etch process include aluminum chloride that condenses in the downstream pump line and clogs vacuum exhaust lines. This reduces pumping speed and causes process variability and yield loss. The downtime required for periodic cleaning reduces throughput. In addition, solid boric oxide and boric acid are formed by the reaction of BCl3 with water vapor and oxygen in the exhaust line of the dry pump, clogging the entrance to the scrubber.

When a dry chemisorption scrubber is used, solid aluminum chloride often clogs its entrance, and contaminates its chemical adsorbent. Installation of a metal etch trap can extend the scrubber service life significantly.

The HPS® Metal Etch Trap, when installed as a component in an Effluent Management Subsystem™, efficiently traps condensable effluents that are generated by aluminum etch processes without reducing pumping speed. High trapping capacity means a longer time between maintenance. Maintenance is simplified by replacing a single disposable trapping element rather than cleaning many feet of vacuum line. Low cost of ownership is achieved by not running heated lines all the way to the scrubber.

Specifications

Part Number: 63-0406211
Capacity 3 lbs AICl3
Flow Conductance (Viscous Flow Region) p = pressure in mTorr
c = 135 + 5.73p
Foreline Pressure approximately 10 mTorr
Gas Flow Rate 200-500 sccm
Major Byproduct AICI3
Materials Exposed to Process Stainless Steel, Viton®
Pressure Drop Across Trap Q = gas flow rate in sccm
p = pressure in mTorr
Delta p = Q/c
Process Pressure 0.0000000001 mTorr
Typical Dry Weight 5.9kg (13 lbs)

Related Items

  • ACS 2000 Single Channel Controller
  • ACM 2000 Multi Channel Controller
  • 903 Inverted Magnetron Transducer (Alternative Pinout Version), 1" Tube
  • 903 Inverted Magnetron Transducer (Alternative Pinout Version), 2¾" CF
  • 903 Inverted Magnetron Transducer (Alternative Pinout Version), NW 25 KF fitting
  • 903 Inverted Magnetron Transducer (Alternative Pinout Version), NW 40 KF
  • 903 Inverted Magnetron Transducer cold cathode, 1" Tube
  • 903 Inverted Magnetron Transducer cold cathode, 2¾" CF
  • 903 Inverted Magnetron Transducer cold cathode, ISO-KF 25
  • 903 Inverted Magnetron Transducer cold cathode, ISO-KF 40
  • 925 MicroPirani™ Transducer, 4 VCR®-F, RS232, 3 set point relays
  • 925 MicroPirani™ Transducer, 4 VCR®-F, RS485, 3 set point relays
  • 925 MicroPirani™ Transducer, 8 VCR®-F, RS232, 3 set point relays
  • PDR900 Single Channel Controller, RS232/RS485
  • Series 937A Digital Combination Vacuum Gauge Controller
  • Metal Etch Trap, ISO-KF NW 50 Inline
  • HPS® Vapor Sublimation Trap for Semiconductor Processes
  • VNC 2 E Vacuum Network Controller, panel-mountable built-in version with valve (without panel, versions including front panel on request)
  • VAP 5 Pirani Vacuum Gauge, set with gauge head
  • VAP 5 Pirani Vacuum Gauge, vacuum gauge only
  • BD 101A Bourdon Mechanical Pressure Gauge
  • BD 101B Bourdon Mechanical Pressure Gauge
  • BD 121 Bourdon Mechanical Pressure Gauge